Train Load Out Facility
Ridge was commissioned to upgrade our client's train load-out facility to ensure uninterrupted operations. The enhancement included a super-structure above the silos to support the shuttle conveyor, facilitating easy silo replacement without disturbing the shuttle or feed conveyor. To limit operational disruption, the feed conveyor was realigned adjacent to the existing one, with silo and shuttle modifications made during a scheduled shutdown.
Brownfield with innovative features
Design allows change out of silos without removing feed and shuttle conveyor
Modules of the super structure are removed in sections for access to silos
Concrete, structural, and mechanical works
Installation, commissioning and handover