Lake Cooper
Ridge was tasked with creating a primary station and surge facility, designed for an 800tph feed and 400tph discharge. The station boasts a retaining wall for 160t haul trucks and a primary hopper with a live capacity of 200t. The surge tunnel is fitted with a concrete reclaim tunnel and 4 chutes, optimising material blending. Key to the projects' success was our detailed design approach, rectifying past challenges and aligning closely with the client's expectations.
Greenfield
12m high retaining wall for 160t GVM haul truck
200t live capacity hopper
4,500t live capacity surge pile
Concrete works
Structural and mechanical works
Design, installation, commissioning and handover