Kilmore Surge Facility
Seeking to optimise the quarry's resource utilisation, Ridge was commissioned to design and construct a surge facility for two distinct products. This facility enhances the quarry's yield by blending these products during extraction, prolonging the availability of the quarry's premium material.
4,000t live surge pile
Dual stockpile cones for different materials
Conveyor system
Extensive 70m concrete surge tunnel
Discharge conveyor to feed existing plant